01
The core distinction
Planora is designed for an earlier decision moment: can one tenant program be represented credibly in one office shell, and can that story be made easier to review?
An architect’s responsibility can extend far beyond that moment into code, technical coordination, documentation, permitting, professional responsibility, and construction administration.
02
When a focused test fit is appropriate
Use a schematic service when the goal is early feasibility and communication, the scope is controlled, and everyone understands that the output is not construction-ready.
- Early location comparison
- Broker-led tenant review
- One schematic planning scenario
- Need for a fast visual discussion artifact
03
When to engage an architect
Engage the appropriate licensed professional when the work requires code validation, a professional seal, permit submissions, construction documents, engineering coordination, or full design development.
04
The two paths can be sequential
A well-labeled schematic test fit can help a team decide whether to advance. If it does, the next step is a properly scoped professional design engagement—not the assumption that the schematic package already did that work.